Objective of our paper is to demonstrate the algorithm with primary focus on delay reduction for effective activity scheduling. The emphasis is on demonstrating the least possible waste d time that could have been achieved given a process flow and its constraint. Emphasis is primarily to reduce delays from the learning from unnecessary wait or wasted time, as to how it could have been replaced by a productive activity. Learnings from live process flows and integrating it with the algorithm will serve as a learning tool, with which future process flows will be benchmarked to. Figure 1 shows the objective flow chart.
Objective flow chart