An Optimal Production Plan for Cashew Nuts Community Enterprise Using Metaheuristic Algorithms

An Optimal Production Plan for Cashew Nuts Community Enterprise Using Metaheuristic Algorithms

Apisak Phromfaiy, Natita Wangsoh, Prayoon Surin
Copyright: © 2022 |Pages: 23
DOI: 10.4018/IJAMC.292514
Article PDF Download
Open access articles are freely available for download

Abstract

The proper production plan plays an important role in the cashew nuts market enterprise in order to reduce cost. This study aims to find the optimal production plan for cashew nuts using ant lion optimization (ALO), symbiotic organisms search (SOS), particle swarm optimization (PSO) and artificial bee colony algorithm (ABC). The novel objective function is introduced in this study. Three input data set, including production cost, holding cost and inventory quantity are investigated. The experiment cases consist of the frequency of production cycle time in January, February and March, respectively. As a results, four algorithms are available to estimate not only the proper production plan of cashew nuts but also an ability in reducing the inventory and the holding costs. In summary, the ALO algorithm provides better predictive skill than others for the cashew nuts production plan with the lowest RMSE value of 0.0913.
Article Preview
Top

Introduction

In recent years, the optimal production plan problem became one of the most important factors in the manufacturing process. The good plan can help the manufacturers in reducing the cost and the waste of the product. Thailand is a country full of the agricultural products. In order to increase the value, the products are always fed into various kinds of manufacturing system, for example, transformation, extending life cycle and packaging. Cashew nuts are a well-known product of Thailand exported to world-wide market. Thailand ranks as the third most important cashew nuts producing in Asia. In 2016, Thailand has only 14,704.64 hectare with major area in Uttaradit, Chonburi and Ubonratchathani, respectively (Department of Agricultural Extention, 2017). However, cashew nuts product trends to greatly decrease due to poor fruit set, cut down and substitute with other trees and low maintenance. Therefore, the proper production plan for cashew nuts during the manufacturing process is needed.

Optimization algorithms play an important role in various fields of study such as economic (Abdi et al., 2018), business (Wang et al., 2019), environment (Longo et al., 2019), biology (Remeseiro & Canedo, 2019), engineering (Houssein et al., 2020), computer science (Devikanniga et al., 2019), electronic (Janprom et al., 2020) and especially in industry. The main concept of optimization is designed to find the optimal solutions in the aspect of maximum or minimum value. It can be classified into deterministic and heuristic approaches (Lin et al., 2012). For industrial application, optimization is widely contributed to solve the optimal production plan or lot sizing problem. Based on related studies, a deterministic model is the most efficient method to solve production scheduling problem in various industrial sectors. However, as the problem becomes larger and more complex, the time taking to solve the problem will also increase. Silver meal algorithm (SM) (Silver & Miltenburg, 1984) is specifically designed to determine simply and effectively a replenishment strategy for the case of a time-varying, but deterministic demand pattern. The solution is to minimize average cost in each period. In addition, Rezaei and Davoodi (2008) use the deterministic model to solve the problem of supply chain with multiple suppliers and multiple products. Based on classical optimization methods, social and cultural data could not be analyzed in the model. The genetic algorithm (GA) is therefore applied to solve the problem. Khakdaman et al. (2015) develop a new optimization model through the development of linear programming to incofse production planning efficiency for hybrid make-to-stock–make-to-order business. The results show that the presented model can be applied in real life problem. However, complex mathematical processing requires high resources, so the integration of artificial intelligence can increase processing efficiency. However, deterministic model is unable to consider any uncertainties. The heuristic algorithm is developed to solve large-scale production scheduling. For example, Ho et al. (2007) propose production planning methods based on the effects of inventory deterioration. Three heuristic methods are improved as follows; net least period cost (nLPC), part-period algorithm (PPA), least total cost (LTC). It is the improvement of nLPC is the best performance under 100 conditions. Beck et al. (2015) propose a dynamic lot-sizing approach to inventory management using leinz–bossert–habenicht (LBH) method. Groff’s rule (GR) and least unit cost (LUC) are applied in LBH and called LBH-LUC and LBH-GR, respectively. The results show that LBH-LUC can be to reduce the cost variability of LUC compared to the WW method.

Complete Article List

Search this Journal:
Reset
Volume 15: 1 Issue (2024)
Volume 14: 1 Issue (2023)
Volume 13: 4 Issues (2022): 2 Released, 2 Forthcoming
Volume 12: 4 Issues (2021)
Volume 11: 4 Issues (2020)
Volume 10: 4 Issues (2019)
Volume 9: 4 Issues (2018)
Volume 8: 4 Issues (2017)
Volume 7: 4 Issues (2016)
Volume 6: 4 Issues (2015)
Volume 5: 4 Issues (2014)
Volume 4: 4 Issues (2013)
Volume 3: 4 Issues (2012)
Volume 2: 4 Issues (2011)
Volume 1: 4 Issues (2010)
View Complete Journal Contents Listing